controlling a stage prince2
The Project Manager does not need to be involved in the day to day delivery of the products; they delegate limits and then stand back. The day-to-day management of the stage consists of authorizing the work to be done, monitoring progress against that work and ensuring that product quality is being met. Whatever happens, there needs to be a decision made either to proceed with it or not, and in that case, this is the implement step. At the end of each stage, the Project . Prince2: 4. Controlling a stage - LinkedIn . PRINCE2 wiki is open-source and published for free under a Creative Commons license. We will be at your side every step of the way. Here is the PRINCE2 Controlling a Stage process to summarise what we have covered in this blog: Im sure that now youve got a bit more insight into how the mechanisms of the Controlling a Stage process works, so I have just one last question for you that is, are you looking for a personal PRINCE2 Mentor and Coach? So, the Controlling a Stage process in PRINCE2 can be successful, the Project Manager needs to step back and away from the detail to look at the bigger picture and decide if the stage is still on track. Capture and examine issues & risks Categorizing and assess impact. KnowledgeHut is an ICAgile Member Training Organization. The first step in controlling this stage is to define the stage boundaries. As an example, suppose one of the team members has gone sick and the project manager needs to talk this through with a resource manager for a replacement, they can do that themselves. Get full access to PRINCE2 Agile and 60K+ other titles, with a free 10-day trial of O'Reilly. process will be invoked and therefore, the Project Manager will start to prepare the project for closure. This process covers the what and when of the Project Managers work during a delivery stage. A PRINCE2 Project is planned, monitored and controlled on a stage-by-stage basis. Get a 1:1 Mentorship call with our Career Advisor. For example, if the development team is falling behind schedule, you may need to allocate additional resources or implement a new schedule to ensure that the project stays on track. This may involve revising the stage plan, allocating additional resources, or implementing risk mitigation strategies. We do this by authorizing Work Packages for the Team Managers. Experience Outcome-Based Immersive Learning, Get Trained by a Stellar Pool of Industry Experts. The project manager will be updating the issue report and stage plan. Written by Frank Turley (his LinkedIn profile). The User agrees and covenants not to hold KnowledgeHut and its Affiliates responsible for any and all losses or damages arising from such decision made by them basis the information provided in the course and / or available on the website and/or platform. This project has been divided into a number of stages, and you are currently responsible for controlling the second stage of the project. To deliver the products for the stage to the agreed quality within agreed cost and time and achieve the defined benefits. You work with the project manager to identify the start and end points of the stage and establish clear targets and milestones for what needs to be achieved during this time. In PRINCE2 we refer to these manageable chunks as stages - actually, they are called Management Stages. PRINCE2 is a widely recognised methodology that can be applied to any project within any sector or industry. Franais PRINCE2 is a process-based, easily tailored and scalable method for managing European and global projects. In PRINCE2, the Project Manager creates Work Packages to provide Team Managers with the information and authorization to build and test the projects products. I found this article very informative about Coaching & Training Services. You work with the development team to ensure that the deliverables produced during the stage meet the required standards and are fit for purpose. That's how confident we are :), __CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"f3080":{"name":"Main Accent","parent":-1},"f2bba":{"name":"Main Light 10","parent":"f3080"},"trewq":{"name":"Main Light 30","parent":"f3080"},"poiuy":{"name":"Main Light 80","parent":"f3080"},"f83d7":{"name":"Main Light 80","parent":"f3080"},"frty6":{"name":"Main Light 45","parent":"f3080"},"flktr":{"name":"Main Light 80","parent":"f3080"}},"gradients":[]},"palettes":[{"name":"Default","value":{"colors":{"f3080":{"val":"var(--tcb-skin-color-0)"},"f2bba":{"val":"rgba(47, 138, 228, 0.5)","hsl_parent_dependency":{"h":210,"l":0.54,"s":0.77}},"trewq":{"val":"rgba(47, 138, 228, 0.7)","hsl_parent_dependency":{"h":210,"l":0.54,"s":0.77}},"poiuy":{"val":"rgba(47, 138, 228, 0.35)","hsl_parent_dependency":{"h":210,"l":0.54,"s":0.77}},"f83d7":{"val":"rgba(47, 138, 228, 0.4)","hsl_parent_dependency":{"h":210,"l":0.54,"s":0.77}},"frty6":{"val":"rgba(47, 138, 228, 0.2)","hsl_parent_dependency":{"h":210,"l":0.54,"s":0.77}},"flktr":{"val":"rgba(47, 138, 228, 0.8)","hsl_parent_dependency":{"h":210,"l":0.54,"s":0.77}}},"gradients":[]},"original":{"colors":{"f3080":{"val":"rgb(23, 23, 22)","hsl":{"h":60,"s":0.02,"l":0.09}},"f2bba":{"val":"rgba(23, 23, 22, 0.5)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.5}},"trewq":{"val":"rgba(23, 23, 22, 0.7)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.7}},"poiuy":{"val":"rgba(23, 23, 22, 0.35)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.35}},"f83d7":{"val":"rgba(23, 23, 22, 0.4)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.4}},"frty6":{"val":"rgba(23, 23, 22, 0.2)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.2}},"flktr":{"val":"rgba(23, 23, 22, 0.8)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.8}}},"gradients":[]}}]}__CONFIG_colors_palette__, __CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"rgb(240, 129, 40)"}},"gradients":[]}}]}__CONFIG_colors_palette__, __CONFIG_colors_palette__%s__CONFIG_colors_palette__, {"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}, __CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"8f594":{"name":"Main Accent","parent":-1},"7e3b5":{"name":"Main Accent Light","parent":"8f594","lock":{"saturation":1,"lightness":1}}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"8f594":{"val":"rgb(17, 137, 198)","hsl":{"h":200,"s":0.84,"l":0.42}},"7e3b5":{"val":"rgb(111, 204, 251)","hsl_parent_dependency":{"h":200,"l":0.71,"s":0.95}}},"gradients":[]},"original":{"colors":{"8f594":{"val":"rgb(19, 114, 211)","hsl":{"h":210,"s":0.83,"l":0.45}},"7e3b5":{"val":"rgb(111, 181, 252)","hsl_parent_dependency":{"h":210,"s":0.95,"l":0.71}}},"gradients":[]}}]}__CONFIG_colors_palette__, __CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"50854":{"name":"Accent Light","parent":"4848b","lock":{"saturation":1,"lightness":1}},"4848b":{"name":"Main Accent","parent":-1},"b65e3":{"name":"Accent Light","parent":"4848b"},"34b3c":{"name":"Second Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default","value":{"colors":{"50854":{"val":"rgb(245, 251, 255)","hsl_parent_dependency":{"h":203,"l":0.98,"s":1}},"4848b":{"val":"var(--tcb-skin-color-0)"},"b65e3":{"val":"rgb(103, 190, 244)","hsl_parent_dependency":{"h":203,"l":0.68,"s":0.86}},"34b3c":{"val":"rgb(255, 190, 40)","hsl":{"h":41,"s":1,"l":0.57,"a":1}}},"gradients":[]},"original":{"colors":{"50854":{"val":"rgb(245, 250, 255)","hsl_parent_dependency":{"h":210,"s":1,"l":0.98,"a":1}},"4848b":{"val":"rgb(31, 84, 175)","hsl":{"h":217,"s":0.69,"l":0.4,"a":1}},"b65e3":{"val":"rgb(47, 138, 231)","hsl_parent_dependency":{"h":210,"s":0.79,"l":0.54,"a":1}},"34b3c":{"val":"rgb(255, 190, 40)","hsl":{"h":41,"s":1,"l":0.57,"a":1}}},"gradients":[]}}]}__CONFIG_colors_palette__, __CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"f3080":{"name":"Main Accent","parent":-1},"f2bba":{"name":"Main Light 10","parent":"f3080"},"trewq":{"name":"Main Light 30","parent":"f3080"},"poiuy":{"name":"Main Light 80","parent":"f3080"},"f83d7":{"name":"Main Light 80","parent":"f3080"},"frty6":{"name":"Main Light 45","parent":"f3080"},"flktr":{"name":"Main Light 80","parent":"f3080"}},"gradients":[]},"palettes":[{"name":"Default","value":{"colors":{"f3080":{"val":"rgba(23, 23, 22, 0.7)"},"f2bba":{"val":"rgba(23, 23, 22, 0.5)","hsl_parent_dependency":{"h":60,"l":0.09,"s":0.02}},"trewq":{"val":"rgba(23, 23, 22, 0.7)","hsl_parent_dependency":{"h":60,"l":0.09,"s":0.02}},"poiuy":{"val":"rgba(23, 23, 22, 0.35)","hsl_parent_dependency":{"h":60,"l":0.09,"s":0.02}},"f83d7":{"val":"rgba(23, 23, 22, 0.4)","hsl_parent_dependency":{"h":60,"l":0.09,"s":0.02}},"frty6":{"val":"rgba(23, 23, 22, 0.2)","hsl_parent_dependency":{"h":60,"l":0.09,"s":0.02}},"flktr":{"val":"rgba(23, 23, 22, 0.8)","hsl_parent_dependency":{"h":60,"l":0.09,"s":0.02}}},"gradients":[]},"original":{"colors":{"f3080":{"val":"rgb(23, 23, 22)","hsl":{"h":60,"s":0.02,"l":0.09}},"f2bba":{"val":"rgba(23, 23, 22, 0.5)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.5}},"trewq":{"val":"rgba(23, 23, 22, 0.7)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.7}},"poiuy":{"val":"rgba(23, 23, 22, 0.35)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.35}},"f83d7":{"val":"rgba(23, 23, 22, 0.4)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.4}},"frty6":{"val":"rgba(23, 23, 22, 0.2)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.2}},"flktr":{"val":"rgba(23, 23, 22, 0.8)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.8}}},"gradients":[]}}]}__CONFIG_colors_palette__, PRINCE2 The Controlling a Stage Process, PRINCE2 Practitioner Personal Coaching Program, Bite-Sized PRINCE2 (PRojectsINaControlledEnvironment). For obvious reasons what the project manager will do, is see what the actual situation is and compare it to the stage plan that the project board approved, to see whether the project is on track.There are various progress evaluation techniques that are used here, such as Gantt Charts and the like, so reviewing the stage status is done directly against the stage plan. Receive completed Work Package Check quality and Configuration Management. PRINCE2 Themes are used and often play quite a central role within some of the PRINCE2 Processes probably center-stage, pardon the pun, is the Controlling a Stage process and in particular, the way in which corrective action is taken which normally involves risks and issues i.e., the Risk Theme and the Change Theme.Want to learn more? In this article, we will discuss the process of controlling a stage in Prince2 and how this helps to ensure the successful delivery of a project. Controlling a Stage in PRINCE2 - PRINCE2.ca by Okazy PRINCE2 is a widely recognised methodology that can be applied to any project within any sector or industry. Other languages: And Highlight Report should be just that giving a high-level view of the stage. KnowledgeHut reserves the right to cancel or reschedule events in case of insufficient registrations, or if presenters cannot attend due to unforeseen circumstances. Required fields are marked *. Progress The purpose of the Controlling a Stage process (CS) is for the Project Manager to assign the work to be done, monitor this work, deal with issues, report We'll help you find it Search 1. Download the free PRINCE2 Process Model. Then we need to implement those actions, which are implemented within the Controlling a Stage process, and often using the Managing Product Delivery process (when it is the team that will be putting these actions in place). Or, in PRINCE2 terms, to ask: are we still within tolerance and can I continue to manage this stage without escalation? PRINCE2s Controlling a Stage process provides a list of activities, inputs and outputs to do this successfully. For example, you might be taught the starting up a project process, then you might look at the business case theme, and so on.Sometimes it is forgotten that in fact the PRINCE2 Themes are used and often play quite a central role within some of the PRINCE2 Processes. PMI, PMP, and PMBOK are registered marks of The Project Management Institute, Inc. That's why stages are not considered the same as any of those concepts. Quality assurance processes, such as reviews and inspections, can be used to identify and address any issues with the deliverables. PRINCE2 Insights - Controlling a stage - YouTube The trigger to start each CS process is the Authorization from the Project Board. EMPII Group BV, Philipssite 5, box 1, 3001 Leuven, Belgium. Key Terms in Prince 2 4. PRINCE2 and PRINCE2 Agile are registered trade marks of AXELOS Limited, used under permission of AXELOS Limited. Progress Attribution-NonCommercial-ShareAlike 4.0 International. The second part is to identify each risk, taking care to first capture the risk cause, then the risk event itself, leading to identify the risk effect (impact). The "Controlling a Stage Process" is the stage in which the Project Manager assigns and monitors the project work to keep the project progress within the tolerances (stage and project) through corrective actions (if needed). The project manager may give out several work packages all at once possibly to several different teams and several different team managers or just one work package at a time.The golden rule is that every work package should have at least one product description contained within it there is no such thing in PRINCE2 as a work package that conducts work without it being defined by a product description, with its appropriate quality criteria. Controlling a PRINCE2 Stage May 3, 2023 By Dave Litten Controlling a PRINCE2 Stage - how to apply this process? fr Manage by Stages :: PRINCE2 wiki This video focuses on controlling a stage process.With the PRINCE2 Foundation training, you will be introduced to the terminology, methodology, framework, common procedures and systems that are used by many project managers all around the world, and gain a much-improved Project Management skillset. Well, thats because the best-laid plans will never be 100% accurate theyll be as good as you can get due to estimating, which by its very nature means that it is your best intelligent thought-through guess, but apart from variances from small estimates, there will be other things that happen that were not planned for. The next step of course is to look upwards and see the bigger picture of the stage itself and this is called forecasting. Deliver the products for the stage to the agreed quality within agreed cost and time and achieve the defined benefits. The objectives of controlling a stage process in PRINCE2 are-To ensure that due attention is paid on the delivery of the product.To keep risks and issues under control.To keep the business case under constant review.To deliver the products for the stage to the agreed quality within agreed cost and time and achieve the defined benefits.And to deliver within the laid down tolerances. Step four and step five are to check for any new or revised risks again looking at the stage plan project plan and business case and checking for issue impacts. 2023, OReilly Media, Inc. All trademarks and registered trademarks appearing on oreilly.com are the property of their respective owners. Step six is to look at resource utilization and any due benefit reviews. Attribution-NonCommercial-ShareAlike 4.0 International. An issue is something that has happened or is about to happen, whereas a risk is something that may or may not happen at some point in the future. The controlling stage process may be used during the initiation stage, mainly if this stage is lengthy or risky. The following are external content provided by or recommended by the author. This button displays the currently selected search type. So, lets dive into the PRINCE2 Controlling a Stage process and show you how things link together. Prince 2 Themes 6. Business Case Theme 7. The stage plan is then developed, which outlines the activities and resources required to meet these targets and milestones. Our mission is to exceed your learning expectations in the most professional and efficient way possible. To facilitate this process, you use a number of key management products, including the stage plan, the stage report, and the exception report. Something went wrong. German. This was a really wonderful post. For example, if the client requests a change to the functionality of the software, you must assess the impact of this change on the project and implement a process for managing the change in a controlled manner. The project manager may be able to do that themselves if it is within their authority, or it may need to be escalated up to the project board. KnowledgeHut is a Microsoft Partner. EMPII Group BV, Philipssite 5, box 1, 3001 Leuven, Belgium. The exception report is used to report any deviations from the stage plan, along with recommendations for corrective action. Step two is to enter and describe the cause and effect in the risk register and step three assesses the risk and plans the appropriate response with regard to the stage plan project plan and the business case. FRM, GARP and Global Association of Risk Professionals, are trademarks owned by the Global Association of Risk Professionals, Inc. The specialist team will execute the work package and create the products. 2023 Okazy Consulting is an Accredited Training Organization of PEOPLECERT and APMG. Do not forget to communicate (the one in the middle). If any deviations from the stage plan are identified, it is important to take corrective action to ensure that the project remains on track. After all, a project does not take place in a vacuum, and I am talking here about issues and risks, and therefore the activity within controlling a stage called Capture and Examine Issues and Risks does exactly that. The following are external content provided by or recommended by theauthor. Authorize a Work Package Assign and agree with the Team Manager. Your blog is very useful for those who want to know about Closing a project, and in this blog, you have explained a lot more about Closing. Today, many people are confused about DevOps training, but I feel that your blog will put an end to that dilemma. The Prince2 methodology is a widely used project management framework that provides a structured approach for organizing and controlling the various stages of a project. If you come from a technical background theres a real temptation to get involved in the detail. pl A PRINCE2 Agile stage contains one or more releases, and each release contains one or more iterations (Sprints in Scrum). In the unlikely event that you are not 100% satisfied - we will gladly arrange a full refund with no quibbles. Take OReilly with you and learn anywhere, anytime on your phone and tablet. Ltd. is a Premier Authorized Training Partner (ATP) of Project Management Institute, Inc. process is then the last part of the 2nd Stage in a two-stage project. There are advantages to working in stages, and they provide a good approach to project planning, as they: There are a minimum of two management stages in a project: the Initiation Stage and one further Management Stage. KnowledgeHut is an Authorized Training Partner of CertNexus. The Controlling a Stageprocess assigns the work within a work package to the specialist team. Further, GARP is not responsible for any fees or costs paid by the user. KnowledgeHut is an ATO of PEOPLECERT. PMP is a registered mark of the Project Management Institute, Inc. CAPM is a registered mark of the Project Management Institute, Inc. PMI-ACP is a registered mark of the Project Management Institute, Inc. PMI-RMP is a registered mark of the Project Management Institute, Inc. PMI-PBA is a registered mark of the Project Management Institute, Inc. PgMP is a registered mark of the Project Management Institute, Inc. PfMP is a registered mark of the Project Management Institute, Inc. KnowledgeHut Solutions Pvt. A PRINCE2 Project is planned, monitored and controlled on a stage-by-stage basis. 19 Controlling a stage 19.1 PRINCE2 guidance on controlling a stage The purpose of the controlling a stage process is to assign work to be done, monitor such work, deal with issues, report progress to the project board, and take corrective actions to ensure that the management stage remains within tolerance. If you are using configuration management, you would then want to update your product status account, but it is optional. Nonetheless, whatever the source of the problem it should be logged either formally or informally as an issue or a new risk. But, as we know, life is not like that. Make sure that plans for future stages can learn from previous stages. The exception report is used to report any deviations from the stage plan, along with recommendations for corrective action.